The two Jeff’s came this morning and put some drywall up and readied the shower area for tiling. One thing that got missed was letting the plumbers know there was a niche going in the shower wall and so they will have to return to re-route the water line around the location.

The envelope tacked to the wall is a note written by Jane with the idea that, if there ever is a future reno in this area, someone will be surprised that a letter was left for them. Who knows when that might be.
And our plan to have a mirror/medicine cabinet combo had to be scrapped because there is a pipe inside the wall where the recessed cabinet was to go.
We had already purchased it, but Jane was able to arrange for its return with a full refund and no shipping charge.
Other than those two issues, everything is going very well.
