Jeff Henderson of Rockland Construction arrived right on time just after 8am this morning and immediately got work.

By 10am they had the bathtub and tile surround removed as well as the vanity and sink.

This is a very encouraging sign and, although he was suggesting a 2 to 3 week timeframe, I am optimistic that the project will be done ahead of that schedule.

In the meantime we are staying out on the deck to be out of their way and the noise.

And Jane is doing some weeding in the back flowerbed.